Trane economizer manual

Quick Links. Table of Contents. Split system ra inverter multi-split 9. Remote split system units air cooled condensing units and evp chillers pages. Split system air conditioners odyssey with symbio controls air handler 5 to 25 tons 52 pages.

Responsible Refrigerant Practices! Trane believes that responsible refrigerant practices are important to the environment, our customers, and the air conditioning industry.

All technicians who handle refrigerants must be certified. The Federal Clean Air Act Section sets forth the requirements for handling, reclaiming, recovering and recycling of certain refrigerants and the equipment that is used in these service procedures. Page Belt tension measurement and deflection reanges Monthly Maintenance Page 6: General Information General Information Overview of Manual Note: One copy of this document ships inside the control panel of each unit and is customer property.

This booklet describes proper installation, operation, and maintenance procedures for air cooled systems. The manufacturer does not recommend field installation of ultraviolet lights in its equipment for the intended purpose of improving indoor air quality. High intensity C-band ultraviolet light is known to severely damage polymer plastic materials and poses a personal safety risk to anyone exposed to the light without proper personal protective equipment.

trane economizer manual

Page 9: Phase Monitor General Information If this circuit is open before the compressor is started, the compressor will not be allowed to operate. The compressor will not be allowed to restart for a minimum of 3 minutes should the contacts close.

It is a manual or auto changeover control with dual setpoint capability. Page Unit Inspection General Information Note: The supply and return air smoke detectors are designed to shut off the unit if smoke is sensed in the supply air stream or return air stream.

This function is performed by sampling the airflow entering the unit at the return air opening. Follow the instructions provided below to assure that the airflow through the unit is sufficient for adequate sampling.

Page Storage General Information Request an immediate joint inspection of the damage by the carrier and the consignee. Do not remove damaged material from the receiving location. Take photos of the damage, if possible. The owner must provide reasonable evidence that the damage did not occur after delivery. Page 14 Unit Dimensions Figure 2. Page 15 Unit Dimensions Figure 4. Page 16 Unit Dimensions Figure 6.Quick Links.

Table of Contents. Installation, Operation. Packaged Rooftop Air Conditioners. Only qualified personnel should install and service the equipment. The installation, starting up, and. Improperly installed, adjusted or altered equipment by an unqualified person could. When working on the equipment, observe all precautions in the literature. Split system air conditioners odyssey with symbio controls air handler 5 to 25 tons 52 pages.

Trane central air conditioning system owners manual 4ttx3, 4ttx4, 4ttx6, 2ttx4, 2ttz9 6 pages. Trane ton water-cooled air conditioners ton air-cooled air conditioners remote air-cooled condensers manual pkg-prcen intellipak signature series pages. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training.

Page 6: General Information General Information Unit Inspection When ordering replacement parts or requesting service, be sure to refer to the specific model number and serial As soon as the unit arrives at the job site number printed on the unit nameplate.

Page 7 24 VAC.

Trane BAYECON103AA Installer's Manual

It is a manual changeover control with single timed override with override cancellation. It is used with a setpoint.

It prevents system. Product contains fiberglass wool. Disturbing the insulation in this product during installation, maintenance or repair will expose you to airborne particles of glass wool fibers and ceramic fibers known to the state of California to cause cancer through inhalation. Page Unit Dimensions Unit Dimensions Unit Clearances assure adequate serviceability, cataloged unit capacity, and peak operating efficiency.

Figure 1 illustrates the minimum operating and service Providing less than the recommended clearances may clearances for either a single or multiple unit installation. Page 12 Unit Dimensions Figure 2. Figure 3. Page 13 Unit Dimensions Figure 4. Page 14 Unit Dimensions Figure 6. Page 15 Unit Dimensions Figure 8. Figure 9. Page 16 Unit Dimensions Figure Page Installation Table 1. Refer to the typical unit operating weights table before proceeding. The checklist listed below is a summary of the steps required to successfully install a commercial unit.

This checklist is intended to acquaint the installing personnel with what is required in the installation process.

It does not replace the detailed instructions called out in the RTV Sealant applicable sections of this manual. Figure Return duct Secure outward edge of the duct cover with two Insulation side up Remove evaporator access panel and supply air access Before drain pan removal, the switch wire must be panels. An overall layout of the various control options available with the required number of conductors for each control Main Unit Power device is illustrated in Figure 29, p.

trane economizer manual

Page 25 Installation Example 3 Figure 28, p.Quick Links. Table of Contents. Commercial Packaged rooftop air conditioners 23 to 42 ton kw commercial 50 hz 44 pages. Variable frequency drive conversion tr1 to tr 24 pages.

Split system ra inverter multi-split 9. They do not contain full them carefully. Page 3: Reception A copy of technicians a better knowledge of this letter must be sent to Trane Do not use the unit's heater as the equipment they are using, or Epinal Operations - Claims team.

Page 6: Installation Installation Figure 2 - Rigging General information: The Roof curb accessory installation must conform to all Roof curbs are available as an local standards and regulations.

The curbs can be adjustable and Reception of units supplied pre-assembled on wooden pallets, packed under plastic film. Refer to Table 2 and the space requirement plan. Page 9: Installing The Unit Vertical discharge, a panel must be and securing the other side with acquired from Trane. If a unit is to be converted to 4.

Slide return duct cover Follow local codes and standard piping practices when running the drain line. Install a trap and be sure to fill with water before starting the unit. Page Gas Pipework Installation Table Page Filter Installation Installation Filter installation Supply fan adjustment To gain access to filters, remove the Use the following procedure to supply fan access panel on determine the proper adjustment of downflow units and the filter access the supply fan for a specific panel on the end for horizontal application.

Page 15 Installation To increase airflow To adjust belt When removing or installing the new belts, do not stretch them over Loosen variable sheave set screw The fan belts must be inspected the sheaves. Loosen the belts using and turn sheave clockwise. Page Electrical Connection Installation Electrical connection Over current protection Appropriate connectors must be provided. Flexible pipe supports are The branch circuit feeding the unit The electric panel is located in the required to prevent noise must be protected in accordance unit compressor section.

Remove transmission in the building's with national or local codes and the compressor access panel. The unit disconnect Unit controlled by thermostat switch must be opened and locked open.Quick Links Download this manual.

Please return to service information pack upon. The economizer is a multi-damper design. It is installed in the. The economizer is fully accessible. Important: After the Economizer installation you must.

Refer to Figure You must report damage and make claims to the transportation company. Report missing parts to your supplier immediately and. Open and lock out all unit disconnects prior to accessory. Do not remove end covers from economizer actuator; the. Down Discharge Economizer and Rain Hood. Disconnect and verify that power is off. Remove these four 4 access panels see Figure 3, page 3 :. Logic Module. See Figure 8, page 6. Using the existing holes in the back of the unit control box. See Figure 8, page.

Module and make the field connections as shown in Figure Table of Contents. Install Economizer Assembly 8. Insert Economizer in Shipping Position 1. Insert Assembly Screw Figure 5. See view A for approximate positioning Figure Continue routing 3. Pull the two 2 Mixed Air 1.

From economizer Use Table 4 and Fig. This manual is also suitable for: Bayeconab Bayeconaa Bayrlaya Bayeconab. Print page 1 Print document 18 pages. Cancel Delete. Sign In OR. Don't have an account? Sign up!Quick Links. Table of Contents. Troubleshooting System Status Checkout Procedure 39 trouble shooting Trane central air conditioning system owners manual 4ttx3, 4ttx4, 4ttx6, 2ttx4, 2ttz9 6 pages.

Trane TSC060ED Installation, Operation And Maintenance Manual

Trane ton water-cooled air conditioners ton air-cooled air conditioners remote air-cooled condensers manual pkg-prcen intellipak signature series pages. Its use els. Page 3: Table Of Contents optional A manual re- This input incorporates the low pressure set for the affected circuit is required. Page 7: Unit Inspection It is used proper phase sequence of L1,L2,L3 for with a Trane Integrated Comfort build- The occupied cooling set point ranges the 3 conductors of a 3 phase circuit.

Unit Weight Corner Wt. Page Foundation Installation Foundation Horizontal Units If the unit is installed at ground level, elevate it above the snow line. Page Ductwork Installation Ductwork 3. That the purposed installation loca- tion provides the required clearance Figure illustrates the supply and re- for proper operation. Insure that the curb is level and square.

Page Rigging Installation Rigging 3. Rig the unit as shown in Figure 3. At- The checklist listed below is a summary tach adequate strength lifting slings of the steps required to successfully in- A Rigging illustration and Center-of- to all four lifting brackets in the unit stall a commercial unit.

Refer to the following instructions to determine if this process is required for the unit undergoing installation. Supplies Needed by Installer for Conversion: 3 oz. The additional limit switch is shipped attached to the blower housing for these models.

To convert the unit to through the base gas, complete the following procedure. The gas supply line must extend The unit is not equipped with an op- cated on the left side of the trans- mm filters. Example 1 illustrates two series circuits with two sensors in each circiut wired in parallel. The square of any number of re- mote sensors required. To prevent injury or death from electrocution, it is the re- sponsibility of the technician to recognize this hazard and use extreme care when performing service procedures with the electrical power energized.

Page Pre - Start Pre - Start tivated individually by temporarily short- 2. If the required CFM is too high, external static pressure is low causing motor HP output to be above table valueUnits with Belt Drive Indoor Fan perform one or both of the following: Much of the systems performance and reliability is closely a. Verify that the dampers stroked to the full open position. Page Fan Belt Adjustment Maintenace 4. Max 3. Page Filters Maintenance Monthly Maintenance [ ] Check the fan shaft bearings for [ ] Inspect both the main unit control wear.

Replace the bearings as nec- panel and heat section control box Before completing the following essary.Quick Links. Table of Contents. Variable frequency drive conversion tr1 to tr 24 pages. Packaged rooftop air conditioners 23 to 42 ton kw commercial 50 hz 44 pages. Split system ra inverter multi-split 9.

trane economizer manual

Page 2: Features And Benefits Here are just some of the features that contractors want a unit that saves time and money. Engineers want a give Voyager its reputation. Voyager delivers all of this and more!

Trane Voyager TSD/TSH 060 Installation And Operation Manual

The Voyager units were built utilizing important input from our consulting Airflow is outstanding. The Voyager engineers. Engineers wanted a unit Page 7 U-shaped airflow performance is from programmable to automatic thermostats. If all of your customers know about Voyager, all would insist on it. Voyager 3 - 25 tons. Page 10 Burners No. Stages Gas Connection Pipe Size in. Compressor No. Page 13 Page 14 This can help if you ever run out unexpectedly. Not only might they be used for cutting bandages, they may also be called upon to cut through clothing and the like.

Economizer Logic Troubleshooting

Discover Newsletters Send us feedback on our site design, bugs, story ideas, maker community events and any other share-worthy thoughts. Make: and Maker Faire are registered trademarks of Maker Media, Inc. Please check your email. You will also be receiving the weekly Make: Newsletter to keep you inspired with new projects and more product reviews.

Thanks for your submission. Our editors will review your materials and follow up with you via email as soon as possible. In the meantime, keep making stuff. Make: is the voice of the Maker Movement, empowering, inspiring, and connecting Makers worldwide to tinker and hack.

Trane TC*150-301 Installation Operation & Maintenance

Subscribe to Make Magazine Today. How to Get Free Steel ChuckE2009 specializes in welding repair and fabrication. Advertisement Projects Skill Builders Contribute Contact Us Explore Making Maker Faire Maker Share Maker Shed Maker Camp Get the Magazine Our Company About Us Advertise with Us Careers Subscriber Services Help Newsletters Follow Us Makers, we want to hear from you. Send us feedback on our site design, bugs, story ideas, maker community events and any other share-worthy thoughts.

trane economizer manual

We can't guarantee a response to each submission, but we promise to think about every one. Sign Up Stay inspired with the Make: newsletter Follow Us Sign Up Stay inspired with the Make: newsletter Make: Projects Skill Builders Contribute Contact Us Explore Making Maker Faire Maker Share Maker Shed Maker Camp Get the magazine Our Company About Us Advertise with Us Careers Help Make: Subscription Services Newsletters Make: and Maker Faire are registered trademarks of Maker Media, Inc.

All rights reserved Send this to a friendYour emailRecipient emailSendFill captcha code Welcome to the Make: Community. You might also like these newsletters: Maker ProThe latest news about startups, products, incubators, and innovators Maker FaireKeep up with the Greatest Show(and tell) on Earth Make: EducationHow making is transforming learning Awesome. Thanks for signing up. Please check your email to confirm. Your FREE PDF is on its way. Your changes have been saved.


thoughts on “Trane economizer manual”

Leave a Reply

Your email address will not be published. Required fields are marked *